Click a plot on the photo
1 / 10









Description
Building plot in the cadastral district of Sędraszyce, gmina Cieszków (Cieszków municipality), powiat milicki (Milicz county), województwo dolnośląskie (Lower Silesia province), near a lake.
What you can build:
There is no MPZP (the local zoning plan) for this area. A warunki zabudowy (WZ, a zoning decision for the plot) has been issued for the plot, allowing the construction of a single-family residential building together with installations and technical equipment and the remaining necessary technical infrastructure. The decision was issued for plot 152/1; the same parameters apply to the other plots in the complex.
Building parameters:
1) non-exceedable building line: minimum 8,00 m from the outer edge of the county road (plot with cadastral no. 197/3)
2) non-exceedable building line: 5,00 m from the outer edge of the internal road (plot with cadastral no. 152/2)
3) distance of buildings from the plot boundaries: according to the requirements of the Regulation of the Minister of Infrastructure of 12.06.2002 on the technical conditions to be met by buildings and their location, and to fire safety regulations
4) size of the built-up area: maximum up to 20% of the plot area
5) width of the front elevation: maximum up to 12,0 m
6) building height to the ridge: up to 9,00 m
7) roof geometry: symmetrical gable roof with a roof pitch of 30 to 45 degrees
8) minimum share of biologically active area: minimum 60% of the plot area
9) minimum number of parking spaces: at least two parking spaces per building
10) heat supply: an obligation to use, for generating energy for heating and technological purposes, fuels with the lowest emission rates, burned in high-efficiency devices, with the option of using renewable energy sources, heat pump
11) sewage disposal: to a planned sanitary sewage tank (if a domestic sewage treatment plant is used, a water law notification must be submitted)
12) management of rainwater and meltwater: rainwater will be discharged over the surface into the ground onto biologically active areas belonging to the Investor
13) waste management: in accordance with separate regulations
14) transport access: a planned exit from the county road - plot with cadastral no. 197/3
15) number of parking spaces: minimum 2 parking spaces
16) other provisions: if drainage (melioration) devices are present within the planned investment, the location of the planned investment must be agreed with the administrator of these devices before a building permit is obtained
17) the planned structures must meet the requirements set out in Article 5(1) of the Act of 7 July 1994, the Construction Law
18) the investment may not restrict third parties' access to a public road, the possibility of using water, sewerage, electricity, or the access of daylight to rooms intended for people to stay in
19) any nuisance related to the investment must be contained within the area covered by the decision
Utilities and infrastructure:
1) electricity - yes
2) water - yes
3) sewage - to a planned sanitary sewage tank (if a domestic sewage treatment plant is used, a water law notification must be submitted)
4) heating - an obligation to use, for generating energy for heating and technological purposes, fuels with the lowest emission rates, burned in high-efficiency devices, with the option of using renewable energy sources, heat pump
5) rainwater - rainwater will be discharged over the surface into the ground onto biologically active areas belonging to the Investor
Access: from the county road - plot with cadastral no. 197/3
Distances:
- Zduny approx. 7 km
- Jutrosin approx. 11 km
- Kobylin approx. 12 km
- Krotoszyn approx. 14 km
- Milicz approx. 15 km
- Lake nearby
Purchase in 0% installments without a bank:
- minimum down payment - 10%
- after paying 10% you already become the owner
- repayment in monthly or other installments
- repayment period of up to 5 years (60 months)
- no credit check
- security - a mortgage only
Plots in the complex
8 of 8 available| Plot | Area | Price | Installment / mo | Status |
|---|---|---|---|---|
| nr 152/1 | 920 m² | 99 000 zł | 1 485 zł | available |
| nr 152/3 | 894 m² | 99 000 zł | 1 485 zł | available |
| nr 152/4 | 920 m² | 99 000 zł | 1 485 zł | available |
| nr 152/5 | 915 m² | 99 000 zł | 1 485 zł | available |
| nr 152/6 | 920 m² | 99 000 zł | 1 485 zł | available |
| nr 152/7 | 899 m² | 99 000 zł | 1 485 zł | available |
| nr 152/8 | 1 019 m² | 99 000 zł | 1 485 zł | available |
| nr 152/9 | 1 019 m² | 99 000 zł | 1 485 zł | available |
Poradniki przed zakupem
Działka na raty bez banku - jak kupić działkę bez kredytuJak kupić działkę na raty bez banku: 0% odsetek, bez BIK, akt notarialny od razu. Wkład 10%, do 60 rat, przykładowe wyliczenia i proces krok po kroku.Warunki zabudowy: co to jest, ile trwa i jak czytać decyzjęCzym jest decyzja o warunkach zabudowy, kto może o nią wystąpić, ile kosztuje i trwa, co określa i kiedy wygasa. Praktyczny poradnik przed zakupem działki.Jak sprawdzić działkę przed zakupem - kompletny checklist 2026Co sprawdzić przed kupnem działki: księga wieczysta, przeznaczenie (MPZP/WZ), media, dojazd, geoportal i klasa gruntu. Praktyczna lista krok po kroku.






























































